FEATURED PROJECTS
35000 m2 of high quality Hotel, consist of 13 Buildings (320 Room), Restaurants, Swimming Pool.
Complete Civil works & Finishing of 10 Islands & 4 Residential Buildings including External Utilities, ( Substations, Retaining walls, Water Tanks, lifting stations, bridges, Driver Rooms, sewage water treatment, in RAK - UAE .
- Repair of concrete Cope face, Beams Deck slab soffit.
- Bearing & Sheet piles
- Fenders bollards & ladders
- Protection of Deck slab & Cope face
- Berth Repair works including demolishing and reinstatement of damaged parts of
Concrete beams supporting the Unloaded Railway.
Expansion of Aqaba the existing natural Wastewater Treatment and construction of
A new mechanical wastewater treatment plant with 12,000 m3/day capacity.
Agricultural Reclaimed Water System (ARW) Reservoir.
Urban Reclaimed Water System (URW) Reservoir.
Main Pump Station Rehabilitation.
Pump Station No. 2 Modifications.
The WWTP consist of the following works:
Two grit washers.
Two fiberglasses Par shall flumes with required instrumentation for flow measurement and recording.
A Flow-splitter to divide the influent
Between the Mechanical plant and the natural Processes.
A new Head works including two influent channels with one manual and one mechanically cleaned screen per channels
Flow distribution Chamber with mixer.
Automatic control gates.
Two Oxidation Ditches.
Distribution Structure.
Two Circular Clarifiers.
Two Ultraviolet disinfection channels.
Chemical Building.
One Static Mixer for Chemical feed.
64 Sludge Drying Beds.
Two screenings washers and compactor.
Utility Water System.
Administration Building
Two Flocculates.
RAS and WAS Pump. Station including three Screw Pumps for RAS service and two
Submersible Pumps for WAS service for WAS service.
Three Modules of continuous backwash Filters.
Rehabilitation of existing office and workshop buildings.
The modification of the exiting Facultative and Maturation Ponds and all related site-works.
Clarifiers
Circular Reinforced concrete structures with a diameters of 8, meters and walls height of 5.55 meters. All was executed utilizing Abu Sa’ad developed formwork system.
Oxidation Ditches
130 M long 43 m wide hydraulic structure 3.8 m height, nothing matches our perfect work in the Oxidation manufactured all circular and other formwork was developed partially
Manufactured.
SLUDGE DRYING BEDS:
R.C Concrete Structures Composed of 8 drying beds each Bed is divided into 8 cells 40 m Long X 8 m width. All concrete were executed utilizing Special Formwork panels developed and manufactured in our workshop-and totally assembled in our site workshop.