AQABA WASTEWATER TREATMENT PLANT
Name of Project:
WWTP
Location:
South of Jordan, Aqaba city
Client:
The Morganti Group Inc.
Consultant:
The Morganti Group Inc.
Main Contractor:
Omar Abu Sa'ad & Sons Co.
Description:
- Expansion of Aqaba the existing natural Wastewater Treatment and construction of
- Agricultural Reclaimed Water System (ARW) Reservoir.
- Urban Reclaimed Water System (URW) Reservoir.
- Main Pump Station Rehabilitation.
- Pump Station No. 2 Modifications.
- Two grit washers.
- Two fiberglasses Par shall flumes with required instrumentation for flow measurement and recording.
- A Flow-splitter to divide the influent
- A new Head works including two influent channels with one manual and one mechanically cleaned screen per channels
- Flow distribution Chamber with mixer.
- Automatic control gates.
- Two Oxidation Ditches.
- Distribution Structure.
- Two Circular Clarifiers.
- Two Ultraviolet disinfection channels.
- Chemical Building.
- One Static Mixer for Chemical feed.
- 64 Sludge Drying Beds.
- Two screenings washers and compactor.
- Utility Water System.
- Administration Building
- Two Flocculates.
- RAS and WAS Pump. Station including three Screw Pumps for RAS service and two
- Three Modules of continuous backwash Filters.
- Rehabilitation of existing office and workshop buildings.
- The modification of the exiting Facultative and Maturation Ponds and all related site-works.